Reliability, Availability, Maintainability,
and Safety (RAMS)
Our RAMS management activities include, but are not limited to the followings:
- System Safety Plan (SSP)
- Preliminary Hazard Analysis (PHA)
- Sub-System Hazard Analysis (SSHA)
- Interface Hazard Analysis (IHA)
- Safety Critical Items List (SCIL)
- Operating and Support Hazard Analysis (O&SHA)
- Fault Tree Analysis (FTA)
- Event Tree Analysis (ETA)
- Quantitative Risk Assessment (QRA)
- Design Safety Review (DSR)
- Safety Audit
- System Integration and Commissioning Programme Plan (SICPP)
- Hazard Log
- Failure Modes, Effects and Criticality Analysis (FMECA)
- Reliability Prediction
- Reliability Apportionment
- Reliability Block Diagram (RBD)
- Reliability Critical Items List (RCIL)
- Maintainability Analyses
- Availability Calculations
- System Assurance Demonstration Plan
- Reliability Demonstration Plan
- Maintainability Demonstration Plan
- Failure Reporting, Analysis and Corrective Action System (FRACAS)
- Operational Safety Report (OSR)
Location
Contract
Taiwan
- Taiwan High Speed Rail Corporation Contract No. S290 Tainan Station
- Taiwan High Speed Rail Corporation Contract No. S215 Taoyuan Station
- Taiwan High Speed Rail Corporation Contract No. S295 Tsoying Station
- Taiwan High Speed Rail Corporation Contract No. S250 Taichung Station
- Taiwan High Speed Rail Corporation Contract No. S280 Chiayi Station
- Taiwan High Speed Rail Corporation Contract No. S220 Hsinchu Station
- Taiwan High Speed Rail Corporation Contract No. D290 Yanchao Depot
- Taiwan High Speed Rail Corporation Contract No. D295 Tsoying Depot
Hong Kong
- KCRC WR CC-202 Yuen Long and Long Ping Station E&M Work
- KCRC WR CC-203 Tin Shui Wai Station E&M Work
- KCRC WR CC-212 Siu Hong Station E&M Work
- KCRC WR CC-213 Tuen Mun Station E&M Work
- KCRC WR CC-300 Tsuen Wan Station & Approach Tunnels Work
- KCRC WR CC-402 Nam Cheong Station E&M Work
- KCRC WR CC-403 Mei Foo to Nam Cheong Tunnel Works
- KCRC WR CC-404 Mei Foo Station E&M Work
- KCRC WR CC-602 Kam Sheung Road Station E&M Work
- KCRC WR CC-604 Pat Heung Maintenance Centre E&M Work
- KCRC WR DB-350 Tai Lam Tunnel E&M Work
- KCRC WR DB-1650 (Electronic Access Control)
- KCRC WR SI-1200
- KCRC WR DB-1400
- KCRC WR DD-400
- KCRC ERE TCC-200 & TCC-300
- KCRC ERE LDD-300
- KCRC ERE LCC-204
- MTRC TKE C664 (Building Services)
- Contract 15/WSD/96 Chlorine Scrubber System for the new Tai Po Treatment Works and Pumping Station
- Damper Analysis
- MTRC C4342.C01E ECS Modification for Phase 2 Stations with Platform Screen Door
- MTRC C681
- MTRC TKE C664 (Building Services)
- MTRC LAR - Pneumatic System for the Whole Line
- MTRC LAR C553
- MTRC LAR C556
Singapore
- LTA Changi Airport Line C553, C573
- LTA North East Line C773
- LTA Dover Station
- LTA Circle Line
- LTA Light Rapid Transit C810
- LTA Existing EW & NS Line